0.5 MW to 500 MW

The power, the land, the building, or the cabinets.

If you are looking for a place to put a load, the scarce thing is not a rendering of a campus. It is megawatts that are real, on a date you can underwrite, in a jurisdiction that will let the project stand. We secure that. The range is one half of a megawatt to 500 megawatts. Raw power. Raw land with power on site. A facility that is already built out. Cabinets that are already in the building, for people who have GPUs and need somewhere to rack them.

You already know which of those you need. Most groups need more than one of them over the life of a deployment: land and power for the campus, a built-out hall for the first tranche, cabinet positions for hardware that cannot sit in a crate until 2028. Send the requirement as it actually is. We will not hand you a single product and ask you to rename your project to fit it.

What we will not do is quote you a megawatt number we cannot support. A site is power we can document: the utility, the service, the expansion, the fiber, the zoning, and the date. If a number is a wish, we say so. If it is contracted or already energized, we say that too.

You have the GPUs.

You own the hardware and you need a place to energize it. We are not selling you compute. We are securing the megawatts, the building, and the date. A half-megawatt rack deployment and a campus that ramps toward 500 MW are the same conversation. You tell us the IT load, the date the first tranche has to be live, and the markets you will actually take. We come back with a site that can carry it.

Raw land, with power on site.

Powered land, not a parcel near a line on a map. Service is on the property or at the road, with the utility, the voltage, the available amps, and any known expansion stated up front. You lease the land and the power. You build what your design requires. This is the offer when you want control of the hall and you do not want to spend a year proving the utility will serve you.

Already built out.

A building that is already standing, already served, and already fit to take a load. You are not funding a ground-up schedule before the first GPU arrives. The depth of that build-out is part of the requirement: power and a shell, a finished electrical room, or a floor ready for your racks. We say which one the site actually is. We do not dress a warehouse up as a commissioned hall.

Cabinets in place. Bring the GPUs.

Some of our clients already have cabinets installed. If you have GPUs and you need racks to put them in, this is that inventory. You are not waiting on a fit-out. You are taking commissioned cabinet positions, on power, inside a building that is already operating. Say how many you need, the power per position, and when the hardware ships.

Why a project here gets to stay.

You have watched capacity die after the term sheet. The utility could not serve the ramp. The county had no ordinance until the hearing. The neighbors heard the plant and saw the water. A load that only takes, on a two-to-four-hour peak the town already pays for, does not survive that room. Ours is built to.

A power system is sized for the peak and then sits underused for the rest of the day. A deployment that draws through the off hours gives that utility a reason to upgrade the system and a load shape that pays for it. On the days the grid is in extremity, the deployment can give capacity back. The community where the project is built is part of the deal, not a press release after the vote. That is why the entitlement is more likely to hold, from the first half megawatt through a build-out measured in the hundreds.

Bring the commercial terms you actually need. A power lease. A ground lease. Cabinet positions on a shorter term while the campus is built. A ramp, not a single energization date. We structure the site to the requirement. The form below is the requirement. Fill in what you know.